Residential Solar & Battery Installation in Radlett, Hertfordshire

Residential | Harris Lane, Radlett, Hertfordshire

Overview

The project at Harris Lane began with a clear objective: to immunise the property against rising energy costs while fully utilising the building’s available structural footprint.

The homeowners sought a robust, high-yield system that went beyond simple daylight savings. Following a comprehensive site analysis, our team designed a bespoke 13.1 kWp solution that capitalises on both the front and rear elevations of the house.

This split-orientation approach ensures a more consistent energy generation curve throughout the day, capturing morning and late-afternoon sunlight rather than just peak midday spikes.

Technically, the installation is built for maximum efficiency and monetisation. We deployed 27 premium 485W panels paired with a sophisticated dual-inverter configuration totalling 14 kW of capacity.

This specific dual-setup was critical; it ensures the system can handle high loads while allowing the user to export and get paid for 100% of their surplus electricity.

Furthermore, we integrated a 10.36 kWh battery storage system that bridges the gap to their pre-existing EV charger, effectively allowing the homeowners to fuel their vehicle with free, self-generated solar power long after the sun goes down.

Key Facts

13.1 kWp
Solar Panel Capacity
10.4 kWh
Battery Storage
3 Tonnes
Annual COβ‚‚ Saved

Performance

This setup allows the property to generate and consume the majority of its own electricity, drastically cutting dependence on the grid and saving the homeowners thousands of pounds annually. The integrated battery storage ensures efficient use of energy, providing protection against future price hikes.

Environmentally, the impact is significant. By generating renewable energy on-site, this home reduces its carbon emissions by approximately 3 tonnes per year, saving over 75 tonnes of COβ‚‚ across the system’s lifespan.

Residential Solar & Battery Installation in Radlett
Residential Solar & Battery Installation in Radlett

System Overview

To achieve maximum efficiency across the property’s layout, we utilized both the front and back roof spaces for the panel installation. The system comprises:

  • 27x 485W Solar Panels: High-output Aiko panels totaling 13.095 kWp.

  • Dual Inverter Setup: 1x Solar/Hybrid Inverter and 1x Battery Inverter (14 kW total capacity).

  • EV Integration: Seamless connection to the home’s existing EV charger, powered directly by stored battery energy.

Case study produced by
Solar Panel Expert and Co-Founder of Synergy PV Renewables, with over 15 years of experience as a qualified electrician. Bringing deep technical knowledge to every project, he is known for his hands-on expertise in helping homeowners and businesses take control of rising energy costs and embrace greener living through reliable, high-performance solar solutions.

Share this project

We’d really appreciate you helping to get the word out, you can share this page via any social media channels or to friends and family via WhatsApp.

Get In Touch

Other Case Studies

Sunley House – Wenzel’s the Bakers Factory, Watford
Commercial
Sunley House, Watford
Commercial | Manufacturing | Sunley House, Watford
Residential Solar PV – Hemel Hempstead
Residential
Hemel Hempstead
Residential | Willow Lane, Hemel Hempstead
Residential Solar & Battery Installation in Radlett
Residential
Radlett, Hertfordshire
Residential | Harris Lane, Radlett, Hertfordshire
Commercial Solar PV – Fenwick Estate
Commercial
Fenwick Estate
Commercial | Social Housing | Clapham North, London
Integrated In-Roof Solar & Battery Storage – Harpenden
Residential
Harpenden
Residential | Bamville Woods, Harpenden
Commercial Solar PV – Hemel Hempstead School
Commercial
Hemel Hempstead
Commercial Solar PV for Hemel Hempstead School

Thinking About Solar?

Our free guide will walk you through the benefits, costs, and savings of solar panels and why choosing Synergy makes all the difference.